尊龙凯时人生就是搏

Service Hotline:

15965316276

Professional focus Core-making equipment

Because of focus, so professional!

News
News
Contact Us

Contact: Manager Li

Mobile: 15965316276

Tel: 0531-61311568

E-mail: jnruisheng@163.com

Address: No. 57, North Xiaoxinzhuang West Street, Huaiyin District, Jinan City

Industry News

Do you know what to pay attention to when using the core shooter?

Author:尊龙凯时人生就是搏铸造Visits:351 Time:2023-02-10

The core shooter is a machine that uses compressed air to evenly inject molding sand into the sand box for pre-compaction, and then applies pressure for compaction. Commonly used are vertical parting boxless injection molding machine and horizontal parting boxless injection molding machine. There are some things that need attention when using the core shooter. Let's take a look at it. I hope you can pay attention to it when using it.

1. Personnel who have not been trained in the operation of this equipment shall not operate this equipment.

2. Before automatic operation, be sure to go through manual idling.

3. Before starting, check whether there is any guide in the moving parts and whether there are non-equipment operators near. Do not put tools and other sundries on the equipment.

4. It is not allowed to touch moving parts and electrical components when the equipment is running.

5. When the equipment in operation stops working suddenly due to the interruption of external power supply, the power switch of the equipment shall be cut off to avoid danger caused by another power call.

6. In equipment maintenance, inspection, adjustment, cleaning, etc. Cut off the main power supply and the main compressed air valve.

7. The solenoid valve may not be restored to its original state after maintenance, inspection and adjustment. Pay attention to observation after power-on and ventilation to avoid danger caused by unexpected action.

8. In case of abnormal sound, smell and other abnormal phenomena in the operation of all parts of the equipment, the operation shall be stopped immediately. After inspection and adjustment, the manual idling test run must be carried out first.

9. When the equipment is stopped after working, it must be stopped at the original position, and then cut off the power and air supply.


Related labels:
Recommended news
Recommended products
Online Service
Contact Us

Tel

15965316276

Work Shift

周一到周五

Company Office Number

0531-61311568

Wechat
Online
sitemap网站地图